Hands-on at one site

90 Day SSIM Nexus Pilot

SSIM is the Systemic Safety Integration Model. The Nexus is the six axis score. This pilot puts that model on one named plant, gate, job, or crew for ninety days.

Office and floor get scored separately. We do not average them into a culture number. Three practices go on the wall. Fourteen locked sheets run the week. We come back on day 90 and score it again.

This is the only commercial install I sell before two close-outs exist. It is not training for 200. It is not an enterprise license. I will not promise that recordables will fall.

What you get

  • Four on-site days in total: three at kickoff and one for the day-90 rescore, plus a remote day-45 check-in. Six axes of the Systemic Safety Integration Model. Two rooms. The two lowest floor scores get named first.
  • Three of the 21 Practices on the wall. No fourth slogan.
  • Fourteen run sheets installed. Version locked. The site does not rewrite the forms.
  • Voice Ladder and Response Code with the bench. Stop is a right. Restart is a call.
  • Daily Radar. Weekly walk log. Binder test at day 30 and day 60.
  • One 45-minute coaching call a week. Unused weeks do not accrue.
  • Day-90 on-site rescore, the fourth on-site day. Close-out memo, three pages or less.

What it is not

  • A keynote.
  • An OSHA week.
  • A rewrite of your SMS or LMS.
  • A contractual drop in TRIR, EMR, or DART.
  • A license to copy the sheets to a second gate. A second site is a second paper after day 90.

How this works across multiple sites

Four questions to ask first

If two of these fail on your floor, the pilot is the right fit. If they hold up, keep the books and save your money.

Fee

Most sites start with the Core 90-Day Pilot at $6,000 (one named site, remote: baseline, 30/60/90 plan, biweekly calls, two program rewrites; on-site days: 0; payment: 50% at signing, 25% at day 30, 25% at day 60). If the written program doesn't match how your crews actually work, I revise it until you accept it, within 30 days of delivery.

The SSIM Nexus Pilot below is the on-site tier, at one named site.

$22,500 · on-site tier, one named site

One named site, ninety days, on site. Four on-site days in total: three at kickoff and one for the day-90 rescore, plus a remote day-45 check-in. Payment: 50% at signing, 25% at day 30, 25% at day 60. Travel is included in southwest Missouri. Kansas City and north/central Missouri add a flat $450. The rest of the Midwest is $1,800 flat or a quote. Outside the Midwest is quoted.

If the written program doesn't match how your crews actually work, I revise it until you accept it, within 30 days of delivery.

Prefer email? Write to EHSConceptsTWS@outlook.com with "Pilot" in the subject.